
Simple WaterGrip Roof Install
Simple Installation of WaterGrip Roof
- Waterproof membrane with root barrier
- Cement pavers
- Edging
- Drainage Mat
- Unplanted Brownie in place
- Planted Brownie in place
- Planted Brownie with irrigation
- Planted Brownie with irrigation and netting
- Sedum packed in pallets for shipping (no crane, shovels, rakes, or wheelbarrow)
1. 2. 3.
4. 5. 6.
7. 8. 9.
Left: Sedum planted — one day
Middle: Sedum planted — two weeks
Right: Sedum planted — four months